(Left)
View of below decks through the freshly cut cockpit floor hole. This has been made to enable easy installation/removal of the Onan generator.
(Right)
The two cockpit drain pipes now welded in position.
(Right)
Janice marking up and cutting out the door in the galley area waterproof bulkhead from ply and core.