Oct 2006
Home Up The Crew The Yacht The Fun

A satisfying month with various jobs finished including fitting the new Bow Thruster tube after the disaster with the Vetus material.  Also welded the propeller boss in place.

I spent time making and welding in place two large anode fittings on either side of the keel box.

Finally Janice & I got the coachroof down from the container (Left) and carefully slid it in under the hull.

  The coachroof is now tacked in place (Right)

www.sailinghols.com

Tel/Ansa: +44 (0) 7968 173147

Email: info@sailinghols.com