A
satisfying month with various jobs finished including fitting the new Bow
Thruster tube after the disaster with the Vetus material. Also welded
the propeller boss in place.
I spent
time making and welding in place two large anode fittings on either side of
the keel box.
Finally Janice & I got the
coachroof down from the container (Left) and carefully slid it in under the
hull.