Bow complete, last plates in place.
Water/fuel tanks now fully welded in place. (Left: inside tank view and Right: tanks either side of hull)
One half of the keel box in production. White plastic sliders in place to check the fit.
www.sailinghols.com
Tel/Ansa: +44 (0) 7968 173147
Email: info@sailinghols.com