| A pivotal year
ahead. The aluminium work is almost finished. We look forward to
starting the woodwork.
|
 |
(Left) The dorade boxes
have been made and installed on the hull. |
 |
(Left) Janice is already installing the insulating
plastic strips and wood battens called furring on all the inside frames,
ready for the ply lining. |
|
 |
(Left)
Rudder stock in place. (Left)
Andy has now installed the stern fairlead, hydraulic windlass and fabricated the chain
hawse pipe.
(Right) Stern anchor in place on the
transom. |
 |