 |
Having returned
from Germany it is all systems go on Project BIG1. The gantry was
fitted with wheels and frame production continued. By the end of the
month I had all the frames completed. (Left)
Janice helped by cutting out a total of 72
holes (2" diameter) from the 36 frames with our biggest drill. (Right) |
 |