Aug 2003
Home Up The Crew The Yacht The Fun

The first task was to build a full size steel flat patch.  A base that is perfectly level and strong enough to support the weight of the complete hull.  The steel box allows a fixing sling around them in order to pull or push on the hull. (Left)

A 20 Foot shipping container Janice bought in her lunch break at Siemens, stacked with the aluminium kit, tooling, etc.  Janice started her welding training by putting the shelving together. (Right)

 

www.sailinghols.com

Tel/Ansa: +44 (0) 7968 173147

Email: info@sailinghols.com